We had a turbine repair where we used DURMETAL® to seal off the steam flow path under the newly installed spill strips. DURMETAL® was applied over 8 months ago in the low pressure section of a 60 MW turbine. The results of this repair to date has shown us an increase of 15% in the efficiency of this unit.

More Articles

View All