Crack on the bottom hull of one of the boats. The leak caused water to come in. Savings on man-hours, downtime, spare parts and slipway approx. $28,000. It was reported that a crack developed on the port side of engine room at frame #7 approx. 5″ at first observation and further to 6″ after two days. Both ends were drilled and plugged with wood. The width of crack at the middle was approx. 3 mm. Used Kevlar® tape according to instructions working with DURMETAL®. No signs of leak after application until to date.

More Articles

View All