Repair carried out with DURMETAL® Coldwelding® to the leaky cooler-header of the air-cooler. Nuovo-Pianone (Italy) compressor unit, in operation at one of our Natural Gas Compressor Stations. The cooler header is about 12 feet above the ground level. To dismantle and refit it through conventional welding process, after repairing, would have taken us more than 5 man-days and approx. 24 hours shut down. With DURMETAL® shut down was only 5 hours.

More Articles