The pipe between the flange and high voltage bushing mounting was broken away from the weld. Manufacturer recommended that this pipe should not be welded in place and suggested your DURMETAL® Coldwelding® System. As these bushing mounts are part of the transformer top, the whole top would have had to be removed, transformer oil taken out and either filtered or replaced with new oil. Time spent on preparation and repair with DURMETAL® Kit was 1 hour. Estimated savings on labour and material $2,200.